Official Website of Kolkata Municipal Corporation
   
۩   প্রথম পাতা
Calculator for Sanction Fee , Wet Work Charge , Stacking Fee and Surcharge


২০১৯-২০২০ অর্থবর্ষের বিবিধ মাশুলের তালিকা







  1) Basic Scale Of Building Permit Fees
  2) Wet Work Charge & Stacking Fees
  3) Waste Water Charges (WS)
  4) Fees For Drainage Development
  5) Infrastructure Development Fees For Common Passage
  6) Surcharge For Commercial Use
  7) Fees For Residential, Govt. Sponsored Educational Institutions & Charitable Building
  8) Extra Charges For Deviation In Height
  9) Fees for Retention of unauthorized Structure
10) Sketch Fee
11) Certified Copy Of Plan
12) Fees for change of Technical Person
13) Fees And Charges For Change Of Use
14) Fees for issuing Completion Certificate
15) Fees for Technical Persons
16) Guard Posting Charges
17) Fees For Repairing Of Existing Building
18) Fees for installation of Lift in existing building
19) Permit fees for Roof Garden if sanctioned as per norm
20) Fees for Swimming Pool
21) Fees For allowing temporary change or temporary construction
22) Charges for installation of Tower/Antenna/Pole

Table 1
Building Plan Proposal Application Fees (One time at the time of First Submission)

for land area upto 500sqm
Proposal Height Fee applicable if primary Use is Residential/ Educational/Institutional (Rs.) Fee applicable if primary Use is other than Residential/ Educational/Institutional (Rs.)
Upto 7 m. 2,000/- 4,000/-
Above 7 m. upto 10 m. 5,000/- 10,000/-
Above 10 m. upto 12.5 m. 10,000/- 20,000/-
Above 12.5 m. upto 15.5 m. 12,000/- 25,000/-
Above 15.5 m. upto 20 m. 15,000/- 30,000/-
Above 20 m. upto 40 m. 20,000/- 40,000/-

Note :
1) For any development work entirely funded by MP/MLA LAD fund or approved under any Central Govt or State Govt. Scheme for Urban Renewal Project No application fee will be leived.
2) The items which are not covered in above shall be charged as will be decided by Mayor/MIC.
Table 1.1
Building Plan Proposal Application Fees (One time at the time of First Submission)
for land area upto 500sqm
Proposal Height Fee Applicable For Charitable Institution/Govt. Sponsored Education Institution/Govt. Sponsored Health Care Unit/Place of Worship (Rs.)
Upto 7 m. 2,00/-
Above 7 m. upto 10 m. 5,00/-
Above 10 m. upto 12.5 m. 1,000/-
Above 12.5 m. upto 15.5 m. 1,200/-
Above 15.5 m. upto 20 m. 1,500/-
Above 20 m. upto 40 m. 2,000/-

Note :
1) For any development work entirely funded by MP/MLA LAD fund or approved under any Central Govt or State Govt. Scheme for Urban Renewal Project No application fee will be leived.
2) The items which are not covered in above shall be charged as will be decided by Mayor/MIC.
Table 1A
Building Plan Proposal Application Fees (One time at the time of First Submission)
for land area upto 500sqm
Proposal Height Fee Application if Primary Use is Residential/Educational/Institutional (Rs.) Fees Applicable if Primary Use is Other than Residential/Educational/Institutional (Rs.)
Upto 7m. 2,500/- 5,000/-
Above 7m upto 10m 7,000/- 13,000/-
Above 10m upto 12.5m 13,000/- 26,000/-
Avobe 12.5m upto 15.5m 16.000/- 33,000/-
Above 15.5m upto 20m 20,000/- 40,000/-
Above 20m upto 40m 26,000/- 50,000/-
Above 40m upto 60m 33,000/- 65,000/-
Above 60m. 40,000/- 78,000/-

Table 1.1A
Building Plan Proposal Application Fees (One time at the time of First Submission)
for land area upto 500sqm
Proposal Height Fee Applicable For Charitable Institution/Govt. Sponsored Education Institution/Govt. Sponsored Health Care Unit/Place of Worship (Rs.)
Upto 7m. 250/-
Above 7m upto 10m 700/-
Above 10m upto 12.5m 1,300/-
Avobe 12.5m upto 15.5m 1,600/-
Above 15.5m upto 20m 2,000/-
Above 20m upto 40m 2,600/-
Above 40m upto 60m 3,300/-
Above 60m. 4,000/-

Note :
1) For any development work entirely funded by MP/MLA LAD fund or approved under any Central Govt. or State Govt. Scheme for Urban Renewal Project no application fee will be levied.
2) The items which are not covered in above shall be charged as will be decided by Mayor/MIC.
3) For multiple block above rate will be for each block for same premises

Table 2
Basic Scale Of Building Permit Fees In Rs.

Total Covered Area In All Floors (In Sq. M.) Incldg. All exempted areas Above 500, For every 100 Sqm. To be added with column-VI. Part above 10 Sqm. Shall be taken as 100 Sqm. For calculation. Part upto 10 Sqm. Shall be neglected.
Sl. No Width of means of access Upto 50 Above 50 upto 100 Above 100 upto 200 Above 200 upto 300 Above 300 upto 400 Above 400 upto 500
I II III IV V VI VII
1 Up to 3 m 900 1650 2250 5400 10000 22000 12000
2 Above 3 m & up to 5 m. 1200 1900 2700 7000 11000 24000 13200
3 Above 5 m & up to 7 m. 1300 2000 2800 7500 13200 27000 15500
4 Above 7 m & up to 9 m. 1400 2100 2900 7700 14400 29000 17000
5 Above 9 m & up to 12 m. 1500 2200 3000 7900 15400 30800 21000
6 Above 12 m & up to 25 m. 1650 2450 3200 8100 18700 34000 23000
7 Above 25 m. 1900 2700 3500 8500 19500 36000 25000

Top
Note :
1) Basic Permit Fee will mean the fees considering Table 2
2) Permit Fee will mean the fees considering Table 2 & Table 3
3) Total Permit Fees will mean the Basic Permit Fee plus other relevant fees and charges
4) Hereafter Wet Work Charges will be termed as WT, Waste Water Charge as WS, Stacking Fees as ST and Infrastructure Development fees for Common Passage as DCP and Surcharge for Non-Residential Building SC. These will collectively be called "Other Fees & Charges".
5) For applying Table 2.,pro-rata fee for proposed area to be calculated considering total covered area of the building .


Table 2A
Basic scale of Building Permit fees in Rs. for Building u/r 142 of building Rule 2009

Total Covered Area In All Floors (In Sq. M.)Incldg. All exempted areas Above 500, For every 100 Sqm. To be added with column-VI. Part above 10 Sqm, shall be taken as 100 Sqm. For calculation. Part upto 10 Sqm. shall be neglected.
Sl. No Height of Proposed Building Upto 50 Above 50 upto 100 Above 100 upto 200 Above 200 upto 300 Above 300 upto 400 Above 400 upto 500
I II III IV V VI VII
1 Up to 10.00 m 1200 1900 2700 7000 11000 24000 13200
2 Above 10m. up to 12.5m. 1300 2000 2800 7500 13200 27000 15500
3 Above 12.5m. upto 15.5m. 1400 2100 2900 7600 13800 28000 16300
4 Above 15.50m. upto 20m. 1500 2200 3000 7900 14600 29500 17300

Top

Note :
1) Basic Permit Fee will mean the fees considering . Table 2A
2) Permit Fees will mean the fees considering Table 2A & Table 3
3) Total Permit Fees will mean the Basic Permit Fee plus other relevant fees and charges
4) Hereafter Wet Work Charges will be termed as WT, Waste Water Charge as WS, Stacking Fees as ST and Infrastructure Development fees for Common Passage as DCP and Surcharge for Non-Residential Building SC. These will collectively be called "Other Fees & Charges".
5) For Building height more than 20 M fees will be calculated 1.5 times of Sl. No. 4 of Table 2A
For applying table 2A pro-rata fee for proposed area to be calculated considering total covered area of the building Incldg. All exempted areas .
Table 3
Category Use Group Type of Use Multiplying factor on Scale of Fees as per Table2
A Residential I) Total covered area in all floors upto 1000 Sq.mtr.
II) Govt. project for Lower Income Group
III) Total covered area in all floors above 1000 Sq.mtr. incldg. staircase & stair lobby
IV) Total covered area in all floors above 10000 Sqm including staircase & stair Lobby.
1 time
1 time
2 times

3 times
B Educational I) Govt./Govt. Aided School, College, Day Care Center, Library etc
II) Non Govt./Non Aided School, College etc.
1 time
3 times
C Institutional I) Govt./Govt. Aided Hospital, Clinic, Dispensary, Sanatorium, Custodial Institution, Mental Hospital, Nursing Home and Pathological lab etc.
II) Non Govt./Non aided -do-
1 time

4 times
D Assembly I) Theatre Hall, Cinema Halls, City Halls, Drive in Theatre, Exhibition Hall, Museum, Skating rink, Gymnasium, Restaurants, Eating House, Hotel, Dormitory(No. of Beds more than 100), Dance Halls, Club-Room, Gymkhana, Passenger terminal, Stadium, Recreation Pier, yoga centers, Pathologial Laboratory etc.
II) Place of Worship, Govt. aided Gymnasium & Yoga Center etc
4 times



1 time
E Business I) Office, Bank, Professional Establishment, Court Houses, Telephone room, Computer Office etc.
II) I. T. Centre, Call Centre
3 times

1 time
F Mercantile Shop, Market, Store, Service Facility, Transport Establishments etc. 6 times
G Industrial . Fabrication/Assembly Plant, Laboratory, Power Plant, Smoke House, Refinery, Gas Plant, Mill, Dairy, Factory, Work-shop, Motor Garage, Printing Press etc. 4 times
H Storage Storage House, Ware House, Cold Storage, Freight Depot, Transit Depot, Store House, Public Garage, Truck Terminal, Stable, Barn etc. 6 times
I Hazardous Storage of Highly Combustible and Explosive material, Chemical Acid, Toxic materials, Fly ash, Dust, Fumes etc. 4 times

Table 3.1
Type of Use Multiplying factor on Scale of Fees as per Table2
Fees Applicable For Charitable
Institution/Govt. Sponsored Educational
Institution/Govt. Sponsored
Health Care Unit/Place of Worship
0.1Times
Sanction of Building Plan (Permit) for any
development work entirely funded by MP/MLA
LAD fund or approved under any Central Govt.
or State Govt. Scheme for Urban Renewal Project.
0.1Times

Note :
1.

The items which are not covered above shall be charged at the rate as will be decided by Mayor/MIC.

2.

In addition to the Permit Fees for the respective category of building, WT, ST & WS shall be realized for all categories of the building as per following:-

3.

For use group under small scale industries building in industrial estates approved by Govt. multiplying factor on scale of fees will be 1 times of Table 2 for total covered area in all floors upto 5000 Sqm. Including staircase & stair Lobby & 2 times of Table 2 for total covered area in all floors above 5000 Sqm. Including staircase & stairlobby.

Top
Table 4
Wet Work Charge & Stacking Fees

Sl. No. Width of Road/ means of access Wet-Work Charge (WT)
Rs. per Sq.m. of total covered area
Stacking Fee (ST)
Rs. per Sq.m. of total covered area of building for 3 months from the date of Commencement
1 Upto 5 m. 20/- 15/-
2 Above 5 m. upto 7 m. 30/- 20/-
3 Above 7 m. upto 15 m. 35/- 30/-
4 Above 15 m. 40/- 40/-

Note : In case of Govt./Govt. Aided Educational Institution and Housing Complex under Govt./Semi Govt./Govt. Undertaking stacking fees may be charged @ 50% of the above rates.

Table 4.1
Wet Work Charge & Stacking Fees

Fees Applicable For Charitable Institution/Govt. Sponsored Education Institution/Govt. Sponsored Health Care Unit/Place of Worship
Sanction of Building Plan (Permit) for any development work entirely funded by MP/MLA LAD fund or approved under any Central Govt. or State Govt. Scheme for Urban Renewal Project
Sl. No. Width of Road/ Means of access Wet-Work Charge (WT)
Rs. per Sq.m. of total covered area
Stacking Fee (ST)
Rs. per Sq.m. of total covered area of building for 3 months from the date of Commencement
1 Upto 5 m. 2/- 1.5/-
2 Above 5 m. upto 7 m. 3/- 2/-
3 Above 7 m. upto 15 m. 3.5/- 3/-
4 Above 15 m. 4/- 4/-

Table 4A
Waste Water Charges (WS)

For Total Covered Area Rs. 10 per Sqm.

Table 4.1A
Waste Water Charges (WS)

In case of Charitable Institution, Govt. Sponsored Educational
Institution, Govt. Sponsored Health Care Unit and Place of
Worship and Sanction of Building Plan (Permit) for any development
work entirely funded by MP/MLA LAD fund or approved under
any Central Govt. or State Govt. Scheme for Urban Renewal
Project (For Total Covered Area)
Rs. 1 per Sqm.

Top
Table 4B
Fees For Drainage Development

Fees for drainage development only applicable for proposal under Section 393 of KMC Act,1980
For Ward 7 to 100 Rate = (A/10+30) Rupees per Sqm of Covered Area subject to maximum of Rs. 100/- per Sqm of Covered Area Where A is the total proposed covered area of the Building or Total Land Area whichever is higher.
Total Payable Amt. of Drainage Development Charge is (Rate X Total Covered Area).
For Ward 1 to 6 and 101 to 141 Rate = (A/10+50) Rupees per Sqm of Covered Area subject to maximum of Rs. 150/- per Sqm of Covered Area
For Ward 142 to 144 Covered area upto 2000 sq. m.
Rate = (A/10+50) Rupees per sq. m. of covered area subject to maximum of Rs. 150/- per sq. m. of covered area. Covered area above 2000 sq. m. & upto 5000 sq. m. @Rs. 250/- per sq. m. of covered area Covered area above 5000 sq. m. & upto 10000 sq. m. @ Rs. 300/- per sq. m. of covered area Covered area above 10000 sq. m. @ Rs. 400/- per sq. m. of covered area


Table 4.1B
Fees For Drainage Development

In case of Charitable Institution, Govt. Sponsored Educational
Institution, Govt. Sponsored Health Care Unit and Place of
Worship and Sanction of Building Plan (Permit) for any development
work entirely funded by MP/MLA LAD fund or approved under
any Central Govt. or State Govt. Scheme for Urban Renewal Project
0.1 time of table 4B.

Note :
1.

There shall be no Drainage Development Fee for the cases having Sanction Plan in respect of retention of any construction in deviation of Sanction Plan under Sec 400 (1) and 416 of KMC Act., 1980 and dealing under Rule 25 2 (a) and 2 (b) of Building Rule 1990/Rule 26 2 (a) and 2 (b) of Building Rule 2009 and issuance of Occupany Certificate and doing renovation work (if no space is generated)

2.

No Drainage Development Fee will be charged in cases of Renovation where no additional space is generated .

3.

In case of revalidation of Building Sanction Plan, full Drainage Development Fee shall be charged at the current schedule of rate. If paid earlier, said amount will be deducted from current fees. No Drainage Development Fee, however, is to be charged for the plan, which expires before completion of five years from the date of sanction due to non-commencement within two years.

Table 5
Infrastructure Development Fees For Common Passage

Group Covered Area/Width of means of access Rate (Rs. per sq. m.)
Residential Building Upto 200 Sqm. covered area Rs. 20/-
Exceeding 200 Sqm. covered area Rs. 42/-
Non-residential/Education/Govt. Aided buildings Upto 9 m. width of means of access Rs. 80/-
Above 9 m. upto 15.0 m. width of means of access Rs. 100/-
Above 15.0 m. width of means of access Rs. 120/-




Table 5.1
Infrastructure Development Fees For Common Passage

Fees Applicable For Charitable Institution/Govt. Sponsored Education Institution/Govt.
Sponsored Health Care Unit/Place of Worship
Sanction of Building Plan (Permit) for any development work entirely funded by MP/MLA LAD
fund or approved under any Central Govt. or State Govt. Scheme for Urban Renewal Project
Group Covered Area/Width of means of access Rate (Rs. per sq. m.)
Residential Building Upto 200 Sqm. covered area Rs. 2/-
Exceeding 200 Sqm. covered area Rs. 4/-
Non-residential Upto 9 m. width of means of access Rs. 8/-
Above 9 m. upto 15 m. width of means of access Rs. 10/-
Above 15 m. width of means of access Rs. 12/-


Top
Table 6
Surcharge for Non-Residential Use

Sl. No Width of Road or Means of Access Surcharge
1 Upto 5 m. Rs. 100 per Sq.m. of covered area
2 Above 5 m. & upto 9 m. Rs. 200 per Sq.m. of covered area
3 Above 9 m. & upto 15 m. Rs. 350 per Sq.m. of covered area
4 Above 15 m. Rs. 500 per Sq.m. of covered area


Table 6.1
Surcharge for Non-Residential Use

Fees Applicable For Charitable Institution/Govt. Sponsored Education Institution/Govt.
Sponsored Health Care Unit/Place of Worship
Sanction of Building Plan (Permit) for any development work entirely funded by MP/MLA LAD
fund or approved under any Central Govt. or State Govt. Scheme for Urban Renewal Project

In case of application u/S 393,393A,394A of the KMC Act.1980 for small scale Industrial Building within Kasba Industrial Estate and other Industrial Estate in KMC area under WBSIDS, 'Surchange for Non-Residential use' may not be levied.

Sl. No. Width of Means of Access Surcharge(Rs)
1 Upto 5 m. Rs. 10 per Sq.m. of covered area
2 Above 5 m. upto 9 m. Rs. 20 per Sq.m. of covered area
3 Above 9 m. & upto 15 m.. Rs. 35 per Sq.m. of covered area
4 Above 15 m. Rs. 50 per Sq.m. of covered area

Note: Total covered area in all floors means total covered area in all floors including all exempted areas.

Fees for sanction under Rule 25 of Bldg. Rules 1990 & Rule 26 for Bldg. Rules 2009 & U/s 402 of KMC Act, 1980 :
Fees for internal deviation which involves deviation from the sanctioned plan within the sanctioned covered space and external deviation from the sanctioned plan which does not infringe any building rule will be levied as following:-

Table 7
For Residential, Govt. Sponsored Educational Institutions & Charitable Bldg.

Sl. No Total covered area considering
all floors in building where deviation takes place
Amount of Permit fees Remarks
1 Upto 100 sq.m. Rs. 1,500/- Any area for external deviation which does not infringe any building rule over the sanctioned limit shall be charged as per sanctioned rate of fees, separately, if applicable, including all other relevant charges.
2 Above 100 sq.m. & upto 200 sq.m. Rs. 3,000/-
3 Above 200 sq.m.. & upto 300 sq.m. Rs. 5,000/-
4 Above 300 sq.m. & upto 500 sq.m. Rs. 10,000/-
5 Above 500 sq.m. & upto 750 sq.m. Rs. 20,000/-
6 Above 750 sq.m. & upto 1000 sq.m. Rs. 32,000/-
7 Above 1000 Sqm. Rs. 1500/- per 100 sq.m. or part thereof for the area above 1000 Sqm.

Top
 

Fees for sanction under Rule 25 of Building Rule 1990 & Rule 26 of Building Rule 2009 for Buildings other than Residential, Govt. Sponsored Educational Institutions & Charitable Buildings
2 times of the fees prescribed in Table 7


Sharing of Cost of Compactor Machine/Compactor Station
Sl. No. Total proposed built-up area Sharing of cost by the applicant
1. 5,000 Sq.m. - upto 10,000 Sq.m 50% of the cost of Movable Compactor machine as fixed by SWM Department to be taken as Rs. 40 Lacs(Rupees Forty Lacs) which includes all ancillary works and other charges
2. Above 10,000 Sq.m. - upto 20,000 Sq.m. 100% of the cost of Movable Compactor machine as fixed by SWM Department to be taken as Rs. 40 Lacs(Rupees Forty Lacs) which includes all ancillary works and other charges
3. Above 20,000 Sq.m. 1. An undertaking has to be given for construction of a Compactor Station within the premises as per specification fixed by SWM Department.

2. Future handling charge of the waste of the compacter station has to be borne by the applicant

3. In the extreme case, where Compactor Station is not feasible due to site condition, the cost of one compactor station has to be borne by the applicant as fixed by SWM Department and as decided by Mayor-in-Council.


Table 8
For Deviation In Height
Under Section 400(1) And Rule 25/Rule26
Sl. No. Nature of Deviation Extra charge for deviation in height without increasing No. of floors
A For deviation in total height above 1% 100% permit fees of one floor area not less than maximum of ground coverage.
- -
B For deviation in height of individual floor by more than 1% of sanctioned height of the said floor 20% permit fees of one floor area of particular floor to which height deviation is effected.
Note :
1. While applying Table 8, both A & B will be applied as the case may be.
2. If any applicant applies for sanction U/R 25 of the Old Rules, and Rule 26 under the New Rules, before commencement notice, no penalty for height deviation (Table 8) will be charged.
3. No. WT., WS., ST & SC will be levied U/R 25/26(2)(b) if no extra space is generated.


Fees for plan approved under office Circular No. 9
Fees for plan approved under office Circular No. 9 of 2013-14 dt. 30.12.2013 read with addendum to office Circular No. 9 of 2013-14 dt. 04.01.2014 Rs. 100.00.

Retention Fees for deviation from Bldg. Permit/any other permission and /or Construction without permission U/s 400

General Guideline

Generally fees for retention of construction without permission or deviated structure Including shifting of walls, columns, stair etc from the sanctioned permit constructed without prior permission, though within the sanctionable limit shall be calculated on the basis of the following table. However during calculation only the portion on which such construction without permission has been done shall be taken into account. For example if there is a deviation of 100 sq. m. charges shall be levied on the basis of 100 sq. m. Finally if it infringes F. A. R. and other irrelaxable rule of the building the multiplying factor shall be applicable on the basis of the base value in the category. Suppose, construction of 100 sq. m. of structure is made without Bldg. permit then the charges shall be determined by multiplying the base value with the multiplying factor as per following table for infringement of Rule in consideration of the total building.


Top
Table 9
Area of deviation from or Construction without bldg.permit. Height of Building Basic Rate
(Rupees per Sqm.)
Multiplying factor on Basic Rates when infringes
(a)Permissible FAR (b)Open spaces
(Affected Portion)
Upto 50 Sq.m. Upto 10.0 m.
Above 10 m. Upto 12.5 m.
Above 12.5 m.Upto 15.5 m.
Above 15.5 m.
200/-
300/-
6,00/-
1,200/-
2
2
2.5
3
2
2
2.5
3
Above 50 Sq.m upto 80 Sq.m. Upto 10.0 m.
Above 10 m. Upto 12.5 m.
Above 12.5 m. Upto 15.5 m.
Above 15.5 m.
225/-
300/-
700/-
1400/-
2
2
2.5
3
2
2
2.5
3
Above 80 Sq.m upto 150 Sq.m. Upto 10.0 m.
Above 10 m. Upto 12.5 m.
Above 12.5 m. Upto 15.5 m.
Above 15.5 m.
250/-
300/-
750/-
1500/-
2
2
2.5
3
2
2
2.5
3
Above 150 Sq.m upto 300 Sq.m. Upto 12.5 m.
Above 12.5 m. Upto 15.5 m.
Above 15.5 m.
400/-
800/-
1,500/-
2
2.5
3
2
2.5
3
Above 300 Sq.m upto 500 Sq.m. Upto 15.5 m.
Above 15.5 m.
900/-
1500/-
2.5
3
2.5
3
Above 500 Sq.m. - 1500/- 3 3
a) For unauthorized installation on lift Rs. 10,000/-per Sq.m of ground Area covered by the lift for Residential Building & Rs. 20,000/- per Sq.M of Ground Area covered by the lift for Non-Residental Building will be charged.
b) For unauthorized multi level car parking(MLCP) Rs. 1,00,000/- per car(excluding base level car park for sanction covered area)will be charged..
Note :
1)     In Case of Charitable Institution , Govt. Sponsored Educational Institution , Govt. Sponsored Health Care Unit and Place of   Worship,rebate,(if Prayer for) up to the limit of 50% of the total retention fees will be considered by Mayor
2)     For the items which are not covered above the amount of rebate (if prayed for) will be decided by Mayor. In case of non-residential building the charges shall be levived two times of fees as per in Table 9 along with sur-charge as applicable in Table No. 6 of the schedule
Charges for reconstruction of roof constructed without prior permission under the appropriate rule of the New Building Rules, 2009 shall be (a) Rs. 150/- per sq.m. of the total covered area upto 100 sq.m. (b) Rs. 300/- sq.m. of the total covered area upto 200 sq.m. and (c) Rs. 400/- per Sqm. of the total covered area for above 200 Sqm. WT, WS & ST will be levied as usual.
 
Top
Note :
1.

1) The shortfall in car parking space, if allowed u/s 400 (1) read with section 416, the charge shall be:
In case of Residential Building,
A. a) Rs. 1,00,000/- for shortfall of each car parking where land area is within 300 Sq. M.
b) Rs. 1, 50,000/- for shortfall of each car parking where land area is above 300 Sq. M. but within 500 SqM.
c) Rs. 2,00,000/- for shortfall of each car parking where land area is above 500 SqM.
In case of Other then Res. Bldg. 1.5 times of above rates subject to a maximum of Rs. 2,50,000/- per car parking
B. Rs. 7,50,000/- for shortfall of each Bus/ Truck parking.

2.

For Conversion of car parking space in Buildings Sanction u/r 142 of Bldg Rules 2009 of KMC Act ,1980:
a)Rs. 5000 per Sq.M. of Conversion Area where Land Area is within 300 sqm.
b)Rs. 7500 per Sq.M. of Conversion Area where Land Area is above 300 Sq.M but within 500 Sq. M.
c) Rs. 10,000/- pr Sqm of Conversion Area where Land Area above 500 Sqm.

3.

For partial construction of columns, beams, slabs, stairs etc. the charges shall be @75% of the charges prescribed in Table 9 for residential and commercial use shall be levied.

4.

In addition to this the sketch fees shall be levied as per Table 9A



Table 9A
Credited copy of Sketch Fee

Sl. No. Group Covered Area Rate (in Rs.)
1. For Residential Building Upto 300 sqm. of covered area :
Above 300 sqm. upto 500 sqm.
Above 500 sqm. upto 1000 sqm.
Above 1000 sqm.
Rs. 1500/-
Rs. 2000/-
Rs. 3000/-
Rs. 4000/-
2. For Educational Institution, Religious Institution and Public Assembly Building and Govt. Hospital etc.
3. For Business Building, Mercantile Building, Industrial Building, Nursing Home, Clinics, Path Labs, Eating House, Hotels, Restaurants. Upto 300 sqm. of covered area
Above 300 sqm. upto 500 sqm.
Above 500 sqm. upto 1000 sqm.
Above 1000 sqm.
Rates will be double the above rates
4. Hazardous Building, Storage Godown
5. Others

Top
Table 10
Certified Copy Of Plan

Size Rate (in Rs.)
For A0 (841mm x1189mm) & A1 (594mm x 841mm) size drawing sheet.
(This size is also to be considered for the drawing sheet sizes exceeding 1.5 times A2 size)
2500/-
For A2 (420mm x 594mm) size & below as well as upto 1.5 times A2 size 1500/-
 
Note :
1. 2 times the above fees will be charged if a person other than the owner applies for.
2. Application fee for certified copy of plan to be charged @ Rs. 100/- per application.

Fees And Charges For Change Of Use Under Sec 416


A. For Issuing Sanction
Any change of use from one category only Permit fees (without Wet Work Charge, Waste Water charge, Stacking fee and Infrastructure Development fee for common passage), for the respective category of Building to which the conversion proposed, according to the width of road shall be charged. In addition to this a Surcharge including Development fees as per Town & Country Planning Act shall be charged.


Top
Table 11
Fees for change of use

Sl. No. Probable date/period when change took place Converted use group Amount of fees to be paid Remarks
1 Before 1.4.84 Guest House, Boarding House, Hotel, Restaurant, Eating House, Nursing Home, Clinics, PathLabs. Marriage/Ceremonial House, Commercial/Business and other non polluting manufacturing units. Permit fees including Surcharge & Development fees (without Wet Work Charges, Waste Water Charge & Staking Fees) at current Rates for the respective category of Building to which the use converted. Since this use group existed before 1.4.84 the infringement if any, shall be retained & accepted
2 From 1.4.84 Guest House, Boarding House, Hotel, Restaurant, Eating House, Nursing Home, Clinics, PathLabs. Marriage/Ceremonial House, Commercial/Business and other non polluting manufacturing units. In addition to the Permit fees at current Rates including Surcharge & Development fees. (without Wet Work Charges, Waste Water Charges & Stacking Fees) for the respective category of Bldg. to which the use converted along with a penalty for six months @ Rs. 100.00 per sq. m. per month shall be charged
Note :
1.

Change of use if permitted, from one category to other category within the same use group 25% of the usual Sanction fees excluding WT, WS, ST & SC (Provided existing use is already sanctioned or it was existing before 01.4.84) is to be paid.

2.

Change of use if permitted, from one category to other category not within the same use group, 100% of usual sanction fees excluding - do--do-

3.

Change of use if permitted, from non residential to residential, 25% of usual Sanction fees as per category being applied for excluding -do- -do-

4.

Above rates are applicable in cases applications are made within the validity period of the present sanction plan and before obtaining completion certificate. If any application is made after obtaining completion certificate or after expiry of validity of sanction, full sanction fees including SC but excluding WT, WS, ST will be charged.

5.

A fine of Rs. 100/- per Sqm. per month considering floor area is to be levied for minimum one month only in case of change of use from non-residential to residential already caused contravening any provision of relevant section, if such area is permitted by the authority. This fine in other cases, however, will be for minimum six months in addition to two times the other fees & charges as per Table 9 when sanctioned by the authority in relaxation of Rule 51 & Rule 61 of Building Rule 1990 or Rule 59 & Rule 69 of Building Rule 2009.

6.

Under special circumstances, if change of use is granted after use as fait accompli, one and half times of the fees of respective scale for respective use group as per Item 1 of Table 11, will be charged.

7.

When covered area is within 50 Sqm., fees for violation of means of access & FAR will be twice the basic permit fees. Payable amount is to be calculated as per the guidelines given below.

8.

When the residential Building converted to non-residential building the fees for open space infringement of rule shall be charges as per Table-9


Guidelines for calculation of permit fees for change of use :
Permit fees u/S 416 in the existing building where sanctioned plan is submitted the rates will be charged considering whole building on pro-rata basis & considering basic rates and multiplying factor with Surcharge & Infrastructural Development fees but without WT, WS & ST. No SC will be charged in cases of conversion from Non-residential to other use group. When pro-rata calculations is not possible due to want of sanctioned plan the usual charges will be multiplied by five times to arrive at leviable charges.

 

Fees for change of Technical Person

Change of LBS/Architect/ESE/Geo-Tech Engineer may be made & an Amount of Rs.10000/- for each such changes will be charged.

In Case department take any disciplinary action for professional misconduct against LBS/Architect/ESE/Geo-Tech Engineer or in case of death of any professional,in that case such change of professional will not be charged.

       For Extension of time period for completion of work in accordance with the sanctioned plan as per provision of Section 399 of KMC Act.

1) For extension of validity of plans (if permitted), the prmit fees as per current rates for the respective category of Building shall be charged according to the width of the Road (as per Table 2 & 3)
2) In case of imcomplete building the balance portion that remains to be cosntructed will be taken into consideration for payment of charges.
3) Where the construction could not be commenced within the stipulated period of time, the fees shall be charges up on the whole building as per current rates (Table 2 & 3) excluding all other fees & charges as per prevailing rate restricting the validity period upto five yeats from the original date of sanction. But further 5 years extension of the validity can be granted from the date of such extension if total permit fees is provided as per prevailing schedule.
4) For cases where:
   a) Construction up to plinth level is completed:-
       i) 90% of the total permit fees for the portion to be revalidated will be levied.
   b) Structural works like columns, slabs in framed structure building or in any mansonry building slab, beams, bricks column, load bearing wall etc. are completed:-
   i) 60 % of total permit fees will be charged when no floor/roof slab has been cast.
   ii) 50% of total permit fes will be charged when floor/roof slab has been cast.
   c) Partition walls, doors and windows, stair, lift machine room & other necessary finishing works are not completed:-
      i) 10 % of total permit fees will be levied upto 300 Sq. M. of floor area.
      ii) 20% of total permit fees will be levied for more than 300 Sq. M. of floor area.
5) If extension of time period is allowed to a Sanction Plan and if it is found that the total covered area of the said plan is more than that permissible under prevailing Building Rule, the prmit fees including all other relevant charges for the excess covered area will be charged at 2 time of the present fees.

Top
Table 12
Fees for issuing Completion Certificate


Use Group Rate in Rupees per Sq.M.
A) Residential, Educational & Institutional
If covered area is within 300 Sq. M. including all exemp.area If covered area is above 300 Sq. M.including all exemp.area
20 30
B) For Govt. sponsored Educational, Institutional & Charitable Building Etc. Irrespective of covered area in all floors : Rs. 1000/- only
C) For Other Categories of Use except A & B For Any covered Area including all exemp.area
50
Note :
1.Rate Shall be determined by considering Total Sanctioned Area of a Use Group.CC/Partial CC Fees Payable will be sum of (Use Group wise Area for which CC/PCC is being Granted multiplied by Corresponding Rate)

2. Additional fees payable for partial CC cases :
In addition to the normal fees as per the above table for the area for which PCC is being granted, the following fee will be applicable.

If land Area upto 300 Sq.M. and Primary Use Group is Residential / Educational/ Institutional , additional fee of Rs. 2000/- applicable.
If Land Area above 300 Sq.M. and upto 500 Sq.M. and Primary Use Group is Residential / Educational/ Institutional , additional fee of Rs. 5000/- applicable.
If Land Area above 500 Sq.M. or Primary Use Group is Commercial in nature , additional fee of Rs.10,000/- applicable.
For Govt sponsored Educational, Gove. Sponsored Institutional & Charitable Buildings additional fee of Rs. 1,000/- applicable.
3. In case of Building funded entirely by MP/MLA/SS fees for CC will not be levied.
4. For Completion Certificate of Buildings which are already occupied (fully or partially) - 4 times of the fees as per Table 12 will be levied for the portion which has been occupied, for rest portion normal fees as per Table 12 will be applicable.

Miscellaneous

i)Fees for certified copies of order etc.CC and other
in connection with U/S 400(1), U/S 416 etc.
ii) Application fee for certified copy of Bldg. Plan
iii)Inspection fee to inspect Bldg. Plan
Rs. 1000/- each case

Rs. 100/-
Rs. 400/- plus application fee of Rs. 100/-

Top
Fees for Technical Personnel
Table 13

Technical Personnel Category Fees (in Rs.) for 1 yr Fees (in Rs.) for 3 yrs.
Licensed Building Surveyor Class - I 2000/- 4800/-
Licensed Building Surveyor Class - II 1000/- 2400/-
Empanelled Structural Engineer Class - I 3500/- 8400/-
Empanelled Structural Engineer Class - II 2500/- 6000/-
Empanelled Geo-Technical Engineer Class - I 3500/- 8400/-
Empanelled Geo-Technical Engineer Class - II 2500/- 6000/-
Structural Reviewer & E.S.E.-I Combined 12000/- 30000/-

Late Fees
Late fee for renewal of License to be applicable from 1st July
1.Late fee for renewal of License
2.Late fee for renewal of License
3.Late fee for renewal of License
4.Late fee for renewal of License
:
:
:
:
Rs. 250/- per month or part thereof for L.B.S
Rs. 500/- per month or part thereof for E.S.E.
Rs. 1000/- per month or part thereof for Geo-Tech Eng.
Rs. 4000/- per month or part thereof for Structural
                  Reviewer & E.S.E.-I (Combined)
5.Fees for issuing duplicate card for LBS & ESE /Geo-Tech Engineer : Rs. 1200/-
6.Fees for issuing duplicate card Structural Reviewer & E.S.E.-I (Combined) : Rs. 1200/-

Table 14

Fees For repairing Of Existing Building U/s 410 of KMC Act, 1980 & Under Rule 3(2) (e)/(l) Of Building Rules 2009

Width of means of Access Description Rate in Rs. Remarks
Upto 5.0 Mtr. I) R.C.C. Slab/Floor (in floor area)
II) Brick Works
III) Beam, Column, Foundation etc.
100/- per Sqm
300/- per Cum
350/- per Cum

For Building other than residential use group fees U/R 3(2) shall be charged using multiplying factor applicable for respective group.Other fees & charges will be levied as usual

Above 5.0 to 7.0 Mtr. I) R.C.C. Slab/Floor (in floor area)
II) Brick Works
III) Beam, Column, Foundation etc.
125/- per Sqm
350/- per Cum
400/- per Cum
Above 7.0 to 15.0 Mtr. I) R.C.C. Slab/Floor (in floor area)
II) Brick Works
III) Beam, Column, Foundation etc.
150/- per Sqm
350/- per Cum
400/- per Cum
Above 15.0 Mtr I) R.C.C. Slab/Floor (in floor area)
II) Brick Works
III) Beam, Column, Foundation etc.
200/- per Sqm
400/- per Cum
500/- per Cum

Top
Fees for installation of Lift in existing building U/s 410
1. In case of Residential Building Fees : Rs. 5000/- per Sqm. of ground covered area of the lift well including lift loby
2. In case of Office/Commercial/Factory etc. : Rs. 12000/- per Sqm. of ground covered area of the lift well including lift loby

Permit fees for Roof Garden if sanctioned as per norm
Roof Garden with restaurant or commercial use will be charged for effective covered area on roof as per Table 2 & Table 3 considering commercial rates including all the charges.

Fees for Revised sanction
If any revised plan is submitted in modification to a sanctioned building plan within its validity period then the higher of the following amounts will have to be paid by the applicant for revised sanction :-

1. The amount of sanction fees including all other charges (excluding Dr. Dev. Fees) as per present submitted plan on the basis of present rate in excess of the amount paid during initial sanction.
2. 25% of the sanction fees as per present rate including all other charges (excluding Dr. Dev. Fees)as would be applicable from time to time.
In addition to the above the amount of Dr. Dev. Fees as per present submitted Plan in excess of the amount paid during initial sanction is to be paid. If it is found that more than such payable amount is already paid during initial sanction is refund will be made.

Mechanical parking Installation fees
Rs. 50,000/- Per Car Parking.

Fees for Swimming Pool

1.Total fees as will be applicable for the covered area of the galleries considering respective scale of fees and charges has to be levied. 50% of the covered area of the galleries will be taken into consideration for all practical purpose.

2.In addition to above, 10% of the total area of the water body will be taken into consideration as covered area for application of fees and charges for all practical purposes. Area of the bank will not be considered for any fees.
Top
Charges for allowing temporary change of use or for temporary construction allowing relaxation of existing structure for construction main building (if permitted)
1)
2)
3)
4)
5)
For 1 year of part thereof
For 2 years or part thereof
For 3 years or part thereof
For 4 years or part thereof
For 5 years or part thereof
-
-
-
-
-
  25%
  40%
  50%
  70%
100%
of the basic sanction fees as per Table 2
-do-
-do-
-do-
-do-

Charges for installation of Tower/Antenna/Pole (Subject to NOC from respective authority)

1) Sanction fees for each Tower/Pole Rs. 2,00,000/- (Two Lakhs) only
2) Retention fees for installation of each
Tower/Pole installed without sanction
Rs. 3,00,000/- (Three Lakhs) only



Rate for demolition work

  Cost to be realised from person responsible Rs. 12,000 per 100 sqmt.


Top