Schedule of Fees & Charges for the Year 2024 - 2025
Page    ...  |  2  |  3    


I) House drainage connection fees
 
Sl. No. Items Figures in Rupees
1. For supply and laying S.W. pipe on concrete bed (measured from termination point of work done by the owner or occupier to the point of connection including the cost of temp. restoration of road surface) depth of invert upto 2 m. (Excluding shorting) Rs. 1,188/- per m. for 150 mm. internal diameter
Rs. 1,980/- per m. for 225 mm. internal diameter
Rs. 2,806/- per m. for 300 mm. internal diameter
2. -do- -do- depth of invert over 2 mtr. Upto 3 mtr. add for each additional depth of 0.50 m. or less. Rs. 396/- per m. for 150 mm. internal diameter
Rs. 494/- per m. for 225 mm. internal diameter
Rs. 594/- per m. for 300 mm. internal diameter
3. -do- depth of invert over 3 m. and upto 4 m. add for each additional depth of 0.50 m. or less. Rs. 449/- per m. for 150 mm. internal diameter
Rs. 541/- per m. for 225 mm. internal diameter
Rs. 713/- per m. for 300 mm. internal diameter
4. For manhole lamphole, pit & brick sewer connection  
    (a) For internal dia. of pipes upto 225 mm. Rs. 198/- each
    (b) For internal dia. of pipes above 225 mm. but upto
      450 mm.
Rs. 494/- each
5. If the connection crosses tram line extra fee for any depth  
    (a) For double line Rs. 1,122/- (CTC charges to be paid extra)
    (b) For Single line Rs. 792/- (CTC charges to be paid extra)
6. Supply and Laying 150 mm. to 155 mm. dia C.I. Pipe including jointing, caulking, excavation, timbering, de-watering, earthfilling, ramming, soling, restoration and removal of spoils, depth of excavation  
    (a) Not exceeding 2 m. Rs. 3,994/- per m.
    (b) up to 3 m. (0 to 3 M.) Rs. 4,752/- per m.
7. In case the S.W. Pipe, cement are not available in the Corporation Stores and the applicant is permitted by Executive Engineer to supply the same of approved quality for the work a deduction of the articles will be made as below :-  
    (a) For 150 mm. to 155 mm. dia S.W. pipe Rs. 360/- per m.
    (b) For 225 mm. to 230 mm. dia S.W. pipe Rs. 540/- per m.
    (c) For 300 mm. dia S.W. pipe Rs. 990/- per m.
    (d) For Cement in respective cases Rs. 360/- per m.
Rs. 552/- per m.
Rs. 720/- per m.
8. C.I.T. leading connection to be made by the plumber. Rs. 396/- per m.


II) Restoration of Roads
 
Sl. No. Items Figures in Rupees
1. Restoration of water bound macadam road including underbed :-  
a) With brick metals  
    (i) depth of trench upto 1.00 m. Rs. 1,300/- per sq.m. plus 25% Supervision charges
    (ii) depth of trench upto 1.50 m. Rs. 1,674/- per sq.m. plus 25% Supervision charges
b) Stone metal  
    (i) depth of trench upto 1.00 m. Rs. 1,433/- per sq.m. plus 25% Supervision charges
    (ii) depth of trench upto 1.50 m. Rs. 1,925/- per sq.m. plus 25% Supervision charges
2. Restoration of tar/asphalt macadam road including underbed :-  
a) Restoration of Arterial Roads  
    (i) Using Dense Bituminous Macadam and Bituminous Concrete. Rs. 5,982.48 /- per sq.m. plus 25% Supervision charges
    (ii) ) Using Bituminous Macadam and Bituminous Hot-Mix. Rs. 5,874/- per sq.m. plus 25% Supervision charges
b) For Non Arterial Roads  
    (i)Using Bituminous Macadam and Bituminous Hot-Mix Rs. 4550.25/- per sq.m. plus 25% Supervision charges
3. Restoration of stone-set road including underbed :-  
a) depth of trench upto 1.00 m. Rs. 3,100/- per sq.m. plus 25% Supervision charges
b) depth of trench upto 1.50 m. Rs. 3,547/- per sq.m. plus 25% Supervision charges
4. Restoration of I.P.S. pavement including bed :-  
a) depth of trench upto 1.00 m. Rs. 1,395/- per sq.m. plus 25% Supervision charges
b) depth of trench upto 1.50 m. Rs. 1,970/- per sq.m. plus 25% Supervision charges
5. Restoration on B.O.E. paved road including underbed :-  
a) depth of trench upto 1.00 m. Rs. 1,674/- per sq.m. plus 25% Supervision charges
b) depth of trench upto 1.50 m. Rs. 2,364/- per sq.m. plus 25% Supervision charges
6. Restoration of Stone Slab (Mirzapur Chunar) pavement :-  
a) depth of trench upto 1.00 m. Rs. 1,279/- per sq.m. plus 25% Supervision charges
b) depth of trench upto 1.50 m. Rs. 1,880/- per sq.m. plus 25% Supervision charges
7. Restoration of kerb & channel :-  
a) depth of trench upto 1.00 m. Rs. 1,075/- per sq.m. plus 25% Supervision charges
8. Restoration of rubbish footpath or kancha road Rs. 118/- per sq.m.
9. Restoration of Chequered tiles pavement Rs. 2,867/- per sq.m.
10. Restoration of paver block footpath Rs. 2,716/- per sq.m.
11. Notification charges/service charge Rs. 374/-
12. a) Restoration of mastic asphalt Rs. 1,194/- per sq.m. + 25% supervision charge.(This is in addition to usual road restoration charges)
b) Surfacing Cable Duct Manholes where necessary Rs. 1,493/- per sq.m.
13. a) Restoration charges of footpath by laying of cobble stones including preparation of under bed as per specification of existing footpath & Median Rs. 10,296/- per sq.m.
b) Restoration charges of footpath by laying of kuddappa stones including preparation of under bed as per specification of existing footpath Rs. 9,828/- per sq.m.
c) Restoration charges of footpath by laying of kerb & channel including preparation of under bed as per specification of existing footpath & Median Rs. 6,386/- per sq.m.
14. (a) Rest. of cement concrete road (75 mm thick)
(i) depth of trench up to 1.00 m. 1,477/- per sq.m. plus 25% Supervision charges
(ii) depth of trench up to 1.50 m. 1,757/- per sq.m. plus 25% Supervision charges
(b) Rest. of cement concrete road (100 mm thick)
(i) depth of trench up to 1.00 m. 1,619/- per sq.m. plus 25% Supervision charges
(ii) depth of trench up to 1.50 m. 1,899/- per sq.m. plus 25% Supervision charges
Note : Width of the road to be restored should be taken as 1.5 meter for IPS & paver block, 2.0 meter for mastic asphalt/asphalt road.