I) Charges for letting |
|
Sl. No. |
Items |
Rate |
1. |
(a) Hand roller per day to private parties inside Kolkata only, excluding Labour (party will take the roller from site and return back the same at the place where it was kept) |
Rs. 242/- per day of 8 hours or part thereof. |
2. (a) |
For Diesel Road Roller excluding fuel to Corporation works inside Kolkata for (i) 4 hours of part thereof. |
Rs. 2,662/- -do- |
(ii)Beyond 4 hours upto 8 hours. |
Rs. 3,327/- -do- |
2. (b) |
Diesel Road Roller to private parties or outside agencies other than Corporation work (per 8 hours or part thereof excluding fuel). |
Rs. 3,327/- -do- |
2. (c) |
Diesel Road Roller to private parties or outside agencies other than Corporation work outside Kolkata (per 8 hours or part thereof excluding fuel). |
Rs. 5,142/- -do- Plus Rs. 100/- as Khoraki allowance. |
2. (d) |
Extra charges for more than 8 hours in case of (a). |
Rs. 515/- per hour or part thereof. |
2. (e) |
Extra charge for more than 8 hours in case of Oil Roller to private parties other than Corpn. work (b) or (c). |
Rs. 515/- per hour or part thereof. |
3. (a) |
Tar boiler or Tar heater coal fired (excluding fuel & labour) for Corporation Contractor for Corpn. work inside Corpn. area. |
Rs. 302/- per day. |
3. (b) |
Tar boiler or Tar heater to private parties (inside or outside Kolkata area excluding fuel & labour). |
Rs. 605/- per day of 8 hours. |
3. (c) |
Oil filled Tar Boiler or Tar Heater for Corporation Work for K.M.C. Contrs. inside Kolkata (excluding fuel & labour). |
Rs. 412/- per day. |
3. (d) |
Oil filled Tar Boiler or Tar Heater to private parties (inside or outside Kolkata excluding fuel & labour). |
Rs. 798/- per day. |
4. |
Bitumen mixing machine. (Steel -do- craft framed) Excluding P.O.L. & Operator. |
Rs. 2,640/- per day of 8 hours. |
5. |
Spotmix & Supermix brand excluding P.O.L & Operator. |
Rs. 2,805/- per day of 8 hours. |
6. (a) |
Vibrating Road Roller for K.M.C. works only excluding P.O.L. and driving personnel. |
Rs. 798/- per day of 8 hrs |
6. (b) |
-do- to private parties (For outsider other than K.M.C. works excluding P.O.L. and driving personnel). |
Rs. 1,320/- per day of 8 hrs |
7. |
ColdMilling Machine excluding P.O.L. & Operator. |
Rs. 15,125/- per day of 8 hours. |
8. |
Paver Finisher excluding P.O.L. & Operator. |
Rs. 9,075/- per day of 8 hours. |
9. |
Pay Loader excluding P.O.L. & Operator. |
Rs. 9,075/- per day of 8 hours. |
10. |
Bitumen sprayer excluding bitumen, P.O.L. & Operator. |
Rs. 6,050/- per day |
11. (a) |
Tipper Truck (with 10MT hotmix capacity) within Kolkata area excluding P.O.L. & Driver with Helper. |
Rs. 2,420/- per trip. |
11. (b) |
Tipper Truck (with 10MT hotmix capacity) outside Kolkata area (Max. 50 km. up & down distance) excluding P.O.L. & Driver with Helper. |
Rs. 2,420/- per trip. |
12. |
Hotmix as per departmental specification . |
Rs. 5,400/- per MT. |
II) House drainage connection fees |
|
Sl. No. |
Items |
Rate |
1. |
For supply and laying S.W. pipe on concrete bed (measured from termination point of work done by the owner or occupier to the point of connection including the cost of temp. restoration of road surface) depth of invert upto 2 m. (Excluding shorting) |
Rs. 990/- per m. for 150 mm. internal diameter |
Rs. 1,650/- per m. for 225 mm. internal diameter |
Rs. 2,338/- per m. for 300 mm. internal diameter |
2. |
-do- depth of invert over 2 m. and upto 3 m. add for each additional depth of 0.5 m. or less. |
Rs. 330/- per m. for 150 mm. internal diameter |
Rs. 412/- per m. for 225 mm. internal diameter |
Rs. 495/- per m. for 300 mm. internal diameter |
3. |
-do- -do- depth of invert over 3 m. and upto 4 m. add for each additional depth of 0.5 m. or less. |
Rs. 374/- per m. for 150 mm. internal diameter |
Rs. 451/- per m. for 225 mm. internal diameter |
Rs. 594/- per m. for 300 mm. internal diameter |
4. |
For manhole lamphole, pit & brick sewer connection |
|
(a) For internal dia. of pipes upto 225 mm. |
Rs. 165/- each |
(b) For internal dia. of pipes above 225 mm. but upto 450 mm. |
Rs. 412/- each |
5. |
If the connection crosses tram line extra fee for any depth |
|
(a) For double line |
Rs. 935/- (CTC charges to be paid extra) |
(b) For Single line |
Rs. 660/- (CTC charges to be paid extra) |
6. |
Supply and Laying 150 mm. to 155 mm. dia C.I. Pipe including jointing, caulking, excavation, timbering, de-watering, earthfilling, ramming, soling, restoration and removal of spoils, depth of excavation |
|
(a) Not exceeding 2 m. |
Rs. 3,328/- per m. |
(b) up to 3 m. (0 to 3 M.) |
Rs. 3,960/- per m. |
7. |
In case the S.W. Pipe, cement are not available in the Corporation Stores and the applicant is permitted by Executive Engineer to supply the same of approved quality for the work a deduction of the articles will be made as below :- |
|
(a) For 150 mm. to 155 mm. dia S.W. pipe |
Rs. 300/- per m. |
(b) For 225 mm. to 230 mm. dia S.W. pipe |
Rs. 450/- per m. |
(c) For 300 mm. dia S.W. pipe |
Rs. 825/- per m. |
(d) For Cement in respective cases |
Rs. 300/- per m. |
Rs. 460/- per m. |
Rs. 600/- per m. |
8. |
C.I.T. leading connection to be made by the plumber. |
Rs. 330/- per m. |
III) Restoration of Roads |
|
Sl. No. |
Items |
Rate |
1. |
Restoration of water bound macadam road including underbed :- |
|
a) With brick metals |
|
(i) depth of trench upto 1.00 m. |
Rs. 942/- per sq.m. plus 25% Supervision charges |
(ii) depth of trench upto 1.50 m. |
Rs. 1213/- per sq.m. plus 25% Supervision charges |
b) Stone metal |
|
(i) depth of trench upto 1.00 m. |
Rs. 1038/- per sq.m. plus 25% Supervision charges |
(ii) depth of trench upto 1.50 m. |
Rs. 1395/- per sq.m. plus 25% Supervision charges |
2. |
Restoration of tar/asphalt macadam road including underbed :- |
|
a) Width over 7 metre |
|
(i) depth of trench upto 1.00 m. |
Rs. 1938/- per sq.m. plus 25% Supervision charges |
(ii) depth of trench upto 1.50 m. |
Rs. 2288/- per sq.m. plus 25% Supervision charges |
b) Width under 7 metre |
|
(i) depth of trench upto 1.00 m. |
Rs. 1,685/- per sq.m. plus 25% Supervision charges |
(ii) depth of trench upto 1.50 m. |
Rs. 2288/- per sq.m. plus 25% Supervision charges |
3. |
Restoration of stoneset road including underbed :- |
|
a) depth of trench upto 1.00 m. |
Rs. 2246/- per sq.m. plus 25% Supervision charges |
b) depth of trench upto 1.50 m. |
Rs. 2570/- per sq.m. plus 25% Supervision charges |
4. |
Restoration of I.P.S. pavement including bed :- |
|
a) depth of trench upto 1.00 m. |
Rs. 1213/- per sq.m. plus 25% Supervision charges |
b) depth of trench upto 1.50 m. |
Rs. 1493/- per sq.m. plus 25% Supervision charges |
5. |
Restoration on B.O.E. paved road including underbed :- |
|
a) depth of trench upto 1.00 m. |
Rs. 1213/- per sq.m. plus 25% Supervision charges |
b) depth of trench upto 1.50 m. |
Rs. 1,713/- per sq.m. plus 25% Supervision charges |
6. |
Restoration of Stone Slab (Mirzapur/Chunar) pavement :- |
|
a) depth of trench upto 1.00 m. |
Rs. 927/- per sq.m. plus 25% Supervision charges |
b) depth of trench upto 1.50 m. |
Rs. 1,363/- per sq.m. plus 25% Supervision charges |
7. |
Restoration of kerb & channel :- |
|
a) depth of trench upto 1.00 m. |
Rs. 779/- per sq.m. plus 25% Supervision charges |
8. |
Restoration of rubbish footpath or kancha road |
Rs. 85/- per sq.m. |
9. |
Restoration of Chequered tiles pavement |
Rs. 2077/- per sq.m.. |
10. |
Restoration of paver block footpath |
Rs. 2362/- per sq.m. |
11. |
Notification charges/service charge |
Rs. 325/- |
12. |
a) Restoration of mastic asphalt |
Rs. 1038/- per sq.m. + 25% supervision charge. This is in addition to usual road restoration charges. |
b) Surfacing Cable Duct Manholes where necessary |
Rs. 1,298/- per sq.m. |
13. |
a) Restoration charges of footpath by laying of cobble stones including preparation of under bed as per specification of existing footpath & Median |
Rs. 8953/- per sq.m. |
b) Restoration charges of footpath by laying of kuddappa stones including preparation of under bed as per specification of existing footpathi |
Rs. 8546/- per sq.m. |
c) Restoration charges of footpath by laying of kerb & channel including preparation of under bed as per specification of existing footpath & Median |
Rs. 5553/- per sq.m. |
|
Note : Width of the road to be restored should be taken as 1.5 metre for IPS & paver block, 2.0 metre for mastic asphalt/asphalt road. |